Hi! I’m trying to create a perspective based on a tag. But I only want tasks due today and with no due date to appear. I’ve tried a few combinations, and can’t figure it out. If there were a way to have a set of rules for “All” and a set for “Any” (which would include the none-has a dues date), that’d be great, but I can’t see if that’s available. Thank you!
Would something like this work for you? (If the sticking point is creating All/Any/None rule groups, hold the option key when you click the plus sign).
2 Likes
Oh my goodness, yes! It worked! I could not figure out that third level of rule-setting. You’ve made my life much easier. Thank you!
1 Like
This topic was automatically closed 30 days after the last reply. New replies are no longer allowed.