Hide sequential projects that are waiting

Hi,

I have a “Waiting” context which is set to be “On Hold.” Let’s say I have a project for which I am waiting to hear back from someone. I set the project as being “sequential”, and set the top item to have my “Waiting” context. Then the entire project is effectively blocked. When I’m looking at my projects, I don’t want to see this project, until I complete the blocking task during my daily review.

I can’t find the right “project availability” filter that will have the desired effect. These “blocked” projects show up for both “Active” and “Remaining” filters. Am I missing something? I think these blocked projects aren’t really “Active”?

Thanks!